This week the guys on the Arroyo have been working on improving the drainage on #9 fairway on the left side. As you know, we have struggled with this area due to the intense shade produced from the tree line on the South side of the hole. A plugged drain line has made the issue worse. We will be digging out the old section of drain pipe and replacing it with a new section. This will allow more water to flow easily away from the fairway and begin to dry out the area.
Thank you
Damien
No comments:
Post a Comment